The reconstruction of this road involved the dualization of the 3km road from Otano Junction. It also included the improvement of the two major intersections at Otano Junction and School Junction.
The pavement type employed for this project was mainly the flexible pavement design. However, rigid pavements were used at the two major intersections. The flexible pavements (asphalt) came in two layers; binding course and wearing course. The introduction of the paving blocks (rigid pavement) at the major intersections was to withstand torsion and traction that resulted from vehicular turnings at these intersections. The paving blocks were designed to meet the standard strength of 50N/mm2
REHABILITATION OF FLOWER ROAD (4 KM) EAST LEGON
Construction of drains, earth works and double surfacing
DEPARTMENT OF URBAN ROADS
REHABILITATION OF A.R.S ROADS NEAR OBGOJO (3.5KM)
Construction of drains, earth works and double surfacing
DEPARTMENT OF URBAN ROADS
CONSTRUCTION OF NMAIDZRON ROADS (6KM)
Construction of drains, construction of box culverts, gravel works and double surfacing
DEPARTMENT OF URBAN ROADS